Thank you to everyone who came to yesterday’s meeting.
As discussed, the project web page is https://www.transport.nsw.gov.au/projects/current-projects/redfern-station-upgrade-new-southern-concourse.
There’s an online survey at https://yoursay.transport.nsw.gov.au/RedfernNSC.
Feedback can also be sent to projects@transport.nsw.gov.au.
The consultation period closes 31 August.
We encourage you to have your say using one of the above links.
The options discussed are below
Transport for NSW Options
TfNSW Option 1: Little Eveleigh Street Connection
TfNSW Option 2: Ground Level Pathway
(Wilson St Connection)
TfNSW Option 3: Aerial Walkway
(Wilson St Connection)
TfNSW Option 4: South Eveleigh to Wilson St Connection
Community Options
In addition to the above Transport For NSW options, there are a number of options that have been proposed by members of the community.
Journey – “H” Design
Journey – Hybrid Option 2 + 4 (modified)
Journey
(Architects Cracknell & Lonergan v2)
For more information, see the attached pdf from the Community Groups ReConnect Redfern and REDWatch.